Crated to
Commissioned.
Every Unit.
Every Time.
40,000 sq ft of dedicated assembly capacity — combines, planters, and grain carts torqued to spec, test-cycled, and delivered on flatbed before planting season opens.

Assembly Hours
Per Unit Type
Current throughput capacity across all implement categories. Numbers reflect a standard 2-shift operation on our 40,000 sq ft floor with 22 certified technicians.
| Implement Type | Assy Hrs | Torque Pts | Throughput |
|---|---|---|---|
| Row-Crop Planters (12–48 row) | 18–28 hrs | 47 | 8–12 / mo |
| Grain Combines (Full Head) | 24–36 hrs | 63 | 4–6 / mo |
| Self-Propelled Sprayers | 16–22 hrs | 38 | 10–14 / mo |
| Grain Carts & Auger Wagons | 8–12 hrs | 22 | 18–24 / mo |
| Corn Headers (8–16 row) | 12–18 hrs | 31 | 12–16 / mo |
| Draper / Flex Headers | 10–14 hrs | 28 | 14–18 / mo |
* Throughput based on current floor allocation. Peak-season priority scheduling available.

Every crate inventoried against OEM manifest before floor entry. Zero discrepancies tolerated.

Every critical fastener verified with calibrated digital torque tooling. Certificate issued per unit.
99.7% First-Pass
QA Rate
Every unit passes a 47-point inspection before dispatch. Torque values recorded digitally, cross-referenced against OEM specs, and archived per serial number.
72-Hour Average
Dock to Dispatch
Six stages. Zero idle time. Work orders move through the floor in sequence — no batching, no holding. Your unit ships when it's done, not when a batch fills.
Crate inspection, part count against OEM manifest, staging assignment
Header, drive train, and hydraulic sub-assemblies built to torque spec
Full machine integration, wiring harness, and structural torque verification
Hydraulic pressure test, PTO engagement, and operational function check
47-point digital sign-off, serial number archive, certificate of completion
Flatbed load, transport lock verification, delivery coordination
72-hour average includes scheduling buffer. Rush-priority available for pre-season deadlines.

Flatbed-loaded and transport-locked. Delivered to your lot or directly to the farm.
Built for Partners,
Not Transactions
Torque operates as an extension of your operation. Your brand on the QA certificate, your delivery schedule, your specs — we build to your standard.
Regional Dealers
No assembly bays. No floor space. Seasonal demand spikes.
We become your assembly department — you never turn away an order.
OEM Distributors
Scaling into new territories without building facilities.
Drop-in assembly capacity for new markets. Zero construction timeline.
Ag Co-ops
Fleet turnover for hundreds of member farms. Seasonal crunch.
Batch scheduling for co-op fleets. Priority windows before planting season.
We pushed 34 planters through Torque in March. Every one shipped on time. Our technicians didn't touch a single crate.
Expanded into three new counties this year without adding a single assembly bay. Torque handled everything from receiving to flatbed.
47 combines, 12 sprayers, 80 grain carts across one season. The QA documentation alone is worth the contract.
Your First Work Order
Ships in 72 Hours.
No long-term contract required for your first engagement. Send us your manifest, we'll confirm capacity within 24 hours.