LogoTORQUE

Crated to
Commissioned.
Every Unit.
Every Time.

40,000 sq ft of dedicated assembly capacity — combines, planters, and grain carts torqued to spec, test-cycled, and delivered on flatbed before planting season opens.

40Ksq ft
Assembly Floor
200+models
Implement Types
72hravg
Turnaround
Wide-angle mezzanine view of a 40,000 sq ft agricultural equipment assembly floor showing crated implements on receiving dock, overhead crane suspending a row-crop header with two technicians consulting a tablet, and a finished sprayer under inspection lights
Live Floor Status
Units In Progress14
QA Stage6
Ready for Dispatch3
Updated: May 29, 2026
QA Certified Facility

Assembly Hours
Per Unit Type

Current throughput capacity across all implement categories. Numbers reflect a standard 2-shift operation on our 40,000 sq ft floor with 22 certified technicians.

0+
Implement Models
0
Certified Techs
0K
Sq Ft Floor
Implement TypeAssy HrsTorque PtsThroughput
Row-Crop Planters (12–48 row)18–28 hrs478–12 / mo
Grain Combines (Full Head)24–36 hrs634–6 / mo
Self-Propelled Sprayers16–22 hrs3810–14 / mo
Grain Carts & Auger Wagons8–12 hrs2218–24 / mo
Corn Headers (8–16 row)12–18 hrs3112–16 / mo
Draper / Flex Headers10–14 hrs2814–18 / mo

* Throughput based on current floor allocation. Peak-season priority scheduling available.

Agricultural equipment receiving dock with crated planter components on pallets, inventory verification checklist visible, forklift in background moving components to assembly staging area
Receiving Dock

Every crate inventoried against OEM manifest before floor entry. Zero discrepancies tolerated.

Close-up of certified technician using calibrated torque wrench on combine header mounting bolts, digital torque readout visible, QA documentation tablet in foreground showing checkpoint completion
Torque Verification

Every critical fastener verified with calibrated digital torque tooling. Certificate issued per unit.

99.7% First-Pass
QA Rate

Every unit passes a 47-point inspection before dispatch. Torque values recorded digitally, cross-referenced against OEM specs, and archived per serial number.

99.7%FIRST-PASS
47 avg
Torque Checkpoints / Unit
3,200+
QA Certificates Issued
< 0.3%
Rework Rate
IDCheckpointSpecStatus
TQ-01Structural Frame Torque Verification285 ft-lbs ± 5%PASS
TQ-02Drive Train & PTO Connection190 ft-lbs ± 3%PASS
TQ-03Hydraulic Line Fittings45 ft-lbs ± 2%PASS
TQ-04Row Unit Mounting Hardware110 ft-lbs ± 5%PASS
TQ-05Transport Lock & Safety ChainVisual + Load TestPASS
TQ-06Electrical Harness ContinuityFull Circuit TestPASS

72-Hour Average
Dock to Dispatch

Six stages. Zero idle time. Work orders move through the floor in sequence — no batching, no holding. Your unit ships when it's done, not when a batch fills.

S1
Receiving & Inventory2–4 hrs

Crate inspection, part count against OEM manifest, staging assignment

S2
Sub-Assembly6–10 hrs

Header, drive train, and hydraulic sub-assemblies built to torque spec

S3
Main Assembly10–18 hrs

Full machine integration, wiring harness, and structural torque verification

S4
Test Cycle4–6 hrs

Hydraulic pressure test, PTO engagement, and operational function check

S5
QA Documentation1–2 hrs

47-point digital sign-off, serial number archive, certificate of completion

S6
Outbound Logistics2–4 hrs

Flatbed load, transport lock verification, delivery coordination

Total: Dock to Dispatch25–44 hrs

72-hour average includes scheduling buffer. Rush-priority available for pre-season deadlines.

Finished agricultural sprayer gleaming under inspection lights on outbound dock, QA documentation tag hanging from hitch, flatbed truck backing into loading bay in background
Outbound Logistics

Flatbed-loaded and transport-locked. Delivered to your lot or directly to the farm.

Built for Partners,
Not Transactions

Torque operates as an extension of your operation. Your brand on the QA certificate, your delivery schedule, your specs — we build to your standard.

Regional Dealers

No assembly bays. No floor space. Seasonal demand spikes.

We become your assembly department — you never turn away an order.

No capital outlayFlex capacity on demandShips to your lot

OEM Distributors

Scaling into new territories without building facilities.

Drop-in assembly capacity for new markets. Zero construction timeline.

Territory-ready in 30 daysOEM spec complianceScales with your volume

Ag Co-ops

Fleet turnover for hundreds of member farms. Seasonal crunch.

Batch scheduling for co-op fleets. Priority windows before planting season.

Batch schedulingFleet documentationPre-season priority

We pushed 34 planters through Torque in March. Every one shipped on time. Our technicians didn't touch a single crate.

MT
Marcus T.
Operations Manager
Heartland Implement, Ames IA

Expanded into three new counties this year without adding a single assembly bay. Torque handled everything from receiving to flatbed.

DS
Diane S.
Regional Director
AgriDist Midwest Division

47 combines, 12 sprayers, 80 grain carts across one season. The QA documentation alone is worth the contract.

JR
Joel R.
Fleet Manager
Tri-County Ag Co-op, Columbus NE

Your First Work Order
Ships in 72 Hours.

No long-term contract required for your first engagement. Send us your manifest, we'll confirm capacity within 24 hours.